To follow up an inspection report, treat it as a list of work, not a document to file. Link the report to the installation it covers, turn every remark into a task with an owner and a deadline, put the next inspection date in your planning, and close each task with proof.
Then you can show for every building what was found, what was fixed and what is still open. The inspection itself is rarely the problem. The inspector comes, the report arrives by email, and it goes into a folder. The remarks are what slip.
Why do inspection remarks get lost?
Most buildings collect a steady stream of reports: the electrical installation, fire extinguishers and fire detection, lifts, heating, legionella sampling. Each comes from a different inspection body or contractor, in a different format, on a different cycle.
Three things go wrong:
- The report is stored, not read. A twenty-page PDF with three real findings on page 14 lands in a mailbox or a binder. Nobody turns those three findings into work.
- The knowledge sits with one person. One care home told us this autumn that its inspection reports are the only thing still kept in a paper binder. In other calls, with care homes and football clubs, we heard the same pattern: one colleague knows what is in the reports, and the deadlines live in their head. When that person retires or leaves, the follow-up leaves with them.
- Nobody watches the next due date. A certificate expires, and nobody notices until an insurer, an inspector or a licensing body asks for it.
Which inspections should you track?
Start with the legal ones, because they carry a deadline and a liability. In Belgium, the most common for an organisation with its own buildings are:
| Installation | What the rule says | Source |
|---|---|---|
| Electrical installation (non-residential) | Periodic inspection by an accredited body, at least every five years under the AREI | AREI; Codex Book III Title 2 (FOD Werkgelegenheid) |
| Fire extinguishers | Maintenance and inspection at least once a year by a competent person | Codex welzijn op het werk, explained by ANPI |
| Lifts | Preventive inspections by an external technical control service (EDTC); the frequency depends on how maintenance is organised | FOD Economie, Royal Decree of 9 March 2003 |
| Hot water (Flemish care homes) | Legionella risk analysis, management plan and a register of checks and samples | Flemish Legionella Decree, Zorg en Gezondheid. In Wallonia, AVIQ also recommends a legionella management plan |
Your insurer, your municipality or your sector can add to this list, for example fire safety certificates for public events or licence requirements for football clubs. Add contractor maintenance reports for heating, cooling and gas too: they are not always legally required, but they hold the same kind of remarks.
How do you follow up an inspection report in five steps?
1. Link the report to the installation
Store each report with the asset it covers, not in a general folder. The lift report belongs to the lift, the electrical report to the distribution boards of that building. Six months later, anyone who opens the asset sees its latest inspection, its remarks and its history.
2. Turn every remark into a task
Read the report for what needs doing: defects, remarks, points to fix before the next visit. Each one becomes a separate task with three things:
- An owner, internal or a contractor.
- A deadline, based on the severity the inspector gave it.
- The location, so the technician knows where to go.
One remark, one task. A single task called "fix remarks electrical inspection" stays open forever, because nobody can tell which part is done.
3. Put the next inspection in the planning
The report also tells you when the next one is due. Add it as a recurring task with a reminder well before the deadline, so there is time to book the inspection body. In FixForm, an asset type carries the inspection interval, and the next due date is calculated from the date of the last inspection.
4. Close the loop with proof
A task is only done when you can show it. Add a photo, the contractor's invoice or the new inspection certificate to the task when it is closed. That is the record an inspector, insurer or board will ask for.
5. See the status per building
With every report linked and every remark a task, you can answer the question that matters: which installations are in order, which have open remarks and which are overdue? Per building, and across all your sites. That compliance tracking per building is also the basis for next year's budget: installations that keep coming back with remarks are candidates for replacement.
Where does AI save time?
Steps 1 and 2 are where the hours go. Reading a long report, finding the real findings, matching them to the right installation and typing them out as tasks takes time, and it is exactly the work that gets postponed.
The FixForm Compliance Agent does that part. You upload the PDF, and the agent:
- matches the report to the right building,
- links the installations it mentions, or proposes them as new assets,
- extracts each defect and remark as a separate task,
- calculates the next due date from the inspection date and the interval of the asset type,
- marks each asset as compliant, compliant with remarks or non-compliant, based only on what the report says.
Everything lands as a proposal. You accept, edit or reject it, and nothing changes until you do. Processing a report goes from about 90 minutes to about 15. The agent reads reports in Dutch, French and English.
Two limits are worth saying plainly. The agent does not replace the inspector, and it does not judge whether you are legally in order: it reflects what the report states. And it only knows the reports you give it, so step 3 still matters.
Where do you start?
- Collect the last report for each legal inspection in one building.
- Link each report to its installation and check that the asset list is complete.
- Turn the open remarks into tasks with an owner and a deadline.
- Add the next due dates with reminders.
- Repeat for the next building with the same structure.
If you run care homes, our care home maintenance guide covers the rest of the maintenance picture, from QR reporting to budgets.
Frequently asked questions
How long should you keep inspection reports? Keep at least the latest report and certificate for every installation, plus the proof that its remarks were fixed, until the next inspection confirms them. Many organisations keep the full history per asset, because it shows which installations keep failing.
Who is responsible for following up inspection remarks? The owner or the operator of the building, depending on the contract. Under a triple net lease, for example, the operator usually pays for maintenance and most repairs. Write down who owns the follow-up for each installation, so remarks do not fall between two parties.
Can you turn inspection reports into maintenance tasks automatically? Yes. The FixForm Compliance Agent reads uploaded PDF reports, proposes the follow-up tasks and links them to the right asset. You review and approve every proposal.
What is the difference between a remark and a defect? It depends on the inspection body and the installation. In general, an infringement is a non-compliance that must be fixed within the term set in the report, after which the inspection body checks it again. A remark is a point of attention without that obligation. Always follow the term in the report.
Does this work for several buildings? Yes, and that is where it pays off most. With the same structure per building, you see at a glance which sites are up to date. See how sports facilities and care organisations use FixForm.
Written by Stijn, Product and engineering lead at FixForm, with AI assistance, based on the FixForm product, conversations with customers and prospects, and Belgian regulations from FOD Werkgelegenheid, ANPI and Zorg en Gezondheid. Cover photo: Jacob Mejicanos on Unsplash.